Tower Hill Pit Dewatering

SURFACE
Genesis Minerals
LEONORA, WESTERN AUSTRALIA

Genesis Minerals engaged Greenlands Equipment to provide a pumping solution to dewater the Tower Hill Pit, allowing mining operations within the pit to commence. The project consisted of the below main items.

Project Services
  • 1 x pontoon pump system to deliver 80L/s
  • Integration of a telemetry system that could be accessed by the client site SCADA system
  • Integration of a leak detection system
  • Installation and commissioning of the pumping infrastructure and telemetry system
  • Installation of the associated HDPE pipework
No items found.

Feel like a good fit?
Contact Greenlands today.