Riverina Transfer Pump System

Greenlands were contracted to design, supply and install a transfer pump system along with 15.6kM of HDPE to transfer water from the Riverina mine to the Lady Gladys pit. The pump station was fed by 2 x 45kW in pit pontoon pumps.
Project Services
- 4 x 50kL break tanks
- Duty/standby transfer pump system
- Diesel generator
- Bulk diesel storage tank
- HDPE pipeline
- Pipeline leak detection system