Rox Resources Younami Pit Dewatering

SURFACE
Rox Resources
Younami Mine site, WA

Greenlands was contracted to design and install a pumping system and pipeline to dewater the Youanmi Main Pit. The objective was to enable re-access to the existing underground mine, the main portal of which is located within the pit. The in-pit pumps were designed to discharge water to two disused pits and the site evaporation ponds.

Project Services
  • 1 x 75kW pontoon pump system
  • 1 x 92kW pontoon pump system
  • 6kM of 355mm HDPE pipeline
  • Pipeline leak detection system
  • Evaporation pond overflow detection system