Norseman Gold Bore Field

SURFACE
Pantoro
NORSEMAN, WESTERN AUSTRALIA

Greenlands Equipment was engaged by Pantoro to refurbish a historical bore field at the Norseman Gold Mine Site. The project consisted of the below listed main items.

Project Services
  • Camera inspection of the existing bore hole
  • Redevelopment of the existing bore holes
  • Test pumping of the existing bore holes
  • Supply of 3 x bore pump systems
  • Supply of 1 x transfer pump station
  • Integration of a telemetry system that could be accessed by the clients site SCADA system
  • Integration of a leak detection system
  • Installation and commissioning of the pumping infrastructure and telemetry system
  • Installation of the associated 6kM of HDPE pipework to connect the bore field to existing steel trunk main from the upgraded transfer pump station to the process water pond