Moon Pit Dewatering

SURFACE
Northern Star Resources
WILUNA, WESTERN AUSTRALIA

Greenlands Equipment was engaged by Northern Star Resources to provide a pumping solution to dewater the Moon pit to provide construction water to nearby mining operations. The project consisted of the below listed main items.

Project Services
  • 1 x pontoon pump system to deliver 20L/s
  • 1 x diesel generator to power the pumping infrastructure
  • 1 x standpipe and pump system
  • Installation and commissioning of the pumping infrastructure and telemetry system
  • Installation of the associated HDPE pipework
  • Lining of the turkeys to allow for the water to be used for construction activities