Pumping System for Gladstone Pit Dewatering

SURFACE
Pantoro
NORSEMAN, WA

Greenlands was contracted to design and install a pumping system to dewater the Daisy and Gladstone Pits, enabling mining activities to recommence in the Gladstone Pit.

‍

Given the hydraulic connection between the Daisy and Gladstone Pits, the pumps were installed in the Daisy Pit to maintain a low water level. This ensured that water from the Daisy Pit did not flow into the Gladstone Pit and interfere with mining operations.

Project Services
  • Dual 110kW 1000VAC pontoon pumps within the Daisy Pit
  • 1 x 75kW pontoon pump within the Gladstone Pit
  • 1 x Transfer pump station consisting of 4 x 50kL break tanks and 4 x transfer pumps. Pump station designed for a capacity of 200L/s
  • 1 x booster pump station consisting of 4 x 50kL break tanks and 4 x transfer pumps. Pump station designed for a capacity of 200L/s
  • Pipeline leak detection system