Carosue Dam Southern Bore Field

SURFACE
Northern Star Resources
CUNDEELEE, WESTERN AUSTRALIA

Greenlands Equipment was engaged by Northern Star Resources to refurbish a historical bore field at the Carosue Dam Mine Site. The project consisted of the below listed main items.

Project Services
  • Camera inspection of the existing bore hole
  • Redevelopment of the existing bore holes
  • Supply of 5 x bore pump systems
  • Supply of 1 x transfer pump station
  • Integration of a telemetry system that the client's site SCADA system could access
  • Integration of a leak detection system
  • Installation and commissioning of the pumping infrastructure and telemetry system
  • Installation of the associated 32km of HDPE pipework to connect the bore field to the plant process water pond